I got a place on the 512GB with Controller list, and got an email a few days after they started. I ordered it on Friday the 3rd and got it today on Thursday the 9th. The tracking codes were all over the place and gave different estimates depending which branch of each company I used. Steam claimed it was shipped when the courier said they hadn’t got it so I was worried for a few days. But this morning Royal Mail (UK customer) sent me an email saying it would arrive today, while GLS said it would arrive tomorrow.

Safe to say I’m happy to have it now and be playing games!

  • fuckwit_mcbumcrumble@lemmy.dbzer0.com
    link
    fedilink
    arrow-up
    7
    ·
    10 hours ago

    Something can be overpriced and the company can still be losing money on it. How much profit the company making it makes is entirely irrelevant to the usability for the end consumer.

    If they made a bunch of poor choices that made the cost of the product go up that doesn’t change the fact that I could’ve gotten more for my money from a better designed product. Like they could make the entire chassis a solid copper cube and that could cost say $1000 alone. And it could cool like shit. If they did then this $2k copper steam machine would be extremely overpriced.