• 0 Posts
  • 7 Comments
Joined 11 months ago
cake
Cake day: February 24th, 2024

help-circle


  • lonerangers1@lemmy.worldtoMemes@lemmy.mlBrain roll
    link
    fedilink
    English
    arrow-up
    16
    ·
    2 months ago

    Like everything that this goon touches, this neuralink shit is a farce. The leads need to be placed very specifically, then they need to not move with brain growth. They move, and fail, and then musk doctors get to open your head up again to reset them. This shit is never going to be viable. With muskrat involved it is certainly to be a grift.

    But, this company synchron has it figured out. No placing leads, no open brain surgery. Outpatient install, and adaptive. Thing becomes part of the vein wall.



  • funny. I know how that goes myself.

    remod box

    blank plate with 1/2in ko

    run romex from the remod box into the panel, attach SPD to cover, wire to romex. SPD will be sticking out from the wall with this. This is why they make buss mounted SPDs btw. Way less to install. Its also one of those things, if it worked, you will never know unless you have advanced education and monitoring equipment coupled with specific knowledge of each electronic it is supposedly protecting and what “surges” would destroy them. Its borderline snake oil. Not that they are empty plastic boxes with an led, but that you will never know if it works or not. It could also fail and be sitting there protecting nothing when the next storm comes in. If you are looking to meet some warranty conditions, the buss mount or even a conditioner between the outlet and electronic may be an option also.