0x4E4F@sh.itjust.works to There Was An Attempt@lemmy.worldEnglish · 1 year agoto unload 100 tons of steelfiles.catbox.moevideomessage-square42fedilinkarrow-up1181arrow-down12
arrow-up1179arrow-down1videoto unload 100 tons of steelfiles.catbox.moe0x4E4F@sh.itjust.works to There Was An Attempt@lemmy.worldEnglish · 1 year agomessage-square42fedilink
minus-squareTylerdurdon@lemmy.worldlinkfedilinkEnglisharrow-up10·1 year agoI would have lifted up, then pulled the train out, then lowered and pulled manageable quantities.
minus-square0x4E4F@sh.itjust.worksOPlinkfedilinkEnglisharrow-up17·edit-21 year agoActually, everything should be done by crane, but I guess management told them to use the forklifts cuz getting and assembling one on site costs a lot.
minus-squaredessimbelackis@lemmy.worldlinkfedilinkEnglisharrow-up4·1 year agoDoes a crane cost more or less than this fuck up?
minus-square0x4E4F@sh.itjust.worksOPlinkfedilinkEnglisharrow-up6·1 year agoNo, but tell that to Bob from management, who is not an engineer. I’ve been in situations like that. You just don’t do it. Also, explain why in written form and have that stamped and submitted.
minus-squareGithyanki@lemmings.worldlinkfedilinkEnglisharrow-up1·1 year agoI’m going to say less. They can do it by hand now!
minus-squareGood_morning@lemmynsfw.comlinkfedilinkEnglisharrow-up3arrow-down1·1 year agoAlso, at the very least, should’ve had forklifts on opposite sides
I would have lifted up, then pulled the train out, then lowered and pulled manageable quantities.
Actually, everything should be done by crane, but I guess management told them to use the forklifts cuz getting and assembling one on site costs a lot.
Does a crane cost more or less than this fuck up?
No, but tell that to Bob from management, who is not an engineer.
I’ve been in situations like that. You just don’t do it. Also, explain why in written form and have that stamped and submitted.
I’m going to say less. They can do it by hand now!
Also, at the very least, should’ve had forklifts on opposite sides